Case Studies
-
Caxton
- Adapted the design throughout the groundwork process
- Conducted ongoing testing of the foundation piles
- Completed a redesign to cope with a major design
-
Cley Marshes
- Utilised renewable energy resources
- Constructed using sustainable materials
- Award-winning design work
-
The Harbour Project
- Restores the integrity of your existing barriers
- Does not impact the operational capacity of the harbour
- Removes the need for a coffer dam and a pump system